All equipment


As of 2019, GCM Industry and its affiliated companies have 5 advanced mining machine production bases and one production base under construction, with a total production area of 1,200,000 square meters, which can better meet more needs of global customers in the future.

 

Beginning in 1987, GCM industry has developed steadily and steadily in the field of mining machines, and has gradually formed a complete R&D, production, sales and service system.

Click the links below for detailed information about our areas of expertise and broad range of equipment offerings.

For one meter cube of concrete how much kg steel is ...

According calculation! Or do you want to know miniamum value? It should be according local norms. For example, according to SP (Russian norms for Nonprestressed Concrete Structures) minimum reinforcement area should be determined Asmin = mus * b * h0, where Asmin - is the minimum area of reinforcing steel within the tensile zone, mus - is the minimum reinforcement ratio, for bending mus …

How much water needed for 1 cubic meter of reinforced concrete

How much water needed for 1 cubic meter of reinforced concrete Products. As a leading global manufacturer of crushing, grinding and mining equipments, we offer advanced, reasonable solutions for any size-reduction requirements including, How much water needed for 1 cubic meter of reinforced concrete, quarry, aggregate, and different kinds of minerals.

Concrete @ your Fingertips - The Concrete Society

A suitable gauge box or similar is therefore needed. The figures assume a general bulking factor for the materials and does not take into account any water in the sand or aggregate. Water should be added to obtain a workable but non-segregating mix, the total free water being roughly 170 litres per cubic metre of concrete.

weight of one wet cubic meter m30 concrete « BINQ Mining

20 Dec 2012… vary with mix design such as M15 (1:2:4), M20 (1::3), M25, M30 etc. … Let us consider a mix design of 1::3 for our estimation practice. The dry … the total volume of materials required as m3 for 1 m3 of wet concrete. … This will give us the weight of reinforcement steel per cubic meter of concrete…

How much water is needed in this mix of concrete? | Yahoo ...

Oct 05, 2010· I suggest you do a Google search using "concrete mixtures" - typically these give the ratios of water, cement, and sand for different strengths of concrete. One basic mix is, by volume (not weight), 1 part water, 2 parts cement, and 3 parts sand.

How much cement required 1 cubic meter of m20 grade concrete

The Question is How much sand and aggregate required for the one cubic meter of M20 grade concrete? Answer :- 20mm aggregate = 0.90M3 Sand = 0.45M3 to …

Concrete Mix Design | Different Grades of Concrete

May 17, 2017· Water required for 1m 3 of Concrete. = 400 x 0.50 Amount of Water Required for 1m 3 of Concrete = 200kgs = 200 litres. Hence 200 Litres of Water is required for 1m 3 of M20 Concrete. Summary: – 8 bags of cement required for 1 cu.m of M20 grade concrete. 672 kg of Sand required for 1 cu.m of M20 grade concrete.

Concrete slab calculation - KnowledgePoint

For 1 cubic meter, this would equate to approximately, 350kg cement, 875kg sand, 1050kg coarse aggregate (20-5mm) and 180 litres of water. So for 0.15 of a cubic metre you would need 52.5kg cement, 131.25kg sand, 157.50kg aggregate (20-5mm size) and 27 litres of water.

How to Calculate Quantities of Cement, Sand and Aggregate ...

In the step 3 of "How To Calculate Quantities Of Cement, Sand And Aggregate For Nominal Concrete Mix (1:2:4)" you have calculated that: 01 cum of concrete will require Cement required = 1/0.167 = 5.98 Bags ~ 6 Bags Sand required = 115/0.167 = 688 Kgs or 14.98 cft Aggregate required = 209/0.167 = 1251 kgs or 29.96 cft

How many liters water is needed for every cubic meter of ...

Jan 07, 2012· total weight=12x40=480kg/*** for 5cum=480x5=2400kg cement for this of M20 GRADE NOMINAL MIX CONCRETE =2400X30/50=1440 KG WATER. now for actual amount of water for different purpose of concrete say for mass concrete water needed over and above this theoretical value will be less as compared to casting narrow sections like columns, wall.check slump of concrete as …

How to Calculate Cement, Sand and Aggregate required for 1 ...

The proportions of cement, sand, coarse aggregate and water plays an important role in determining the fresh and hardended properties of concrete. So care should be taken while calculating the amount of Cement, Sand and Aggregate required for 1 Cubic meter of Concrete. Method-1: DLBD method to determine material requirement for 1 Cum concrete The DLBD (Dry Loose …

Tutorial: How To Calculate The Amount Of Water Required ...

Aug 24, 2017· In order to be able to calculate the amount of water required for your concrete, you have to know the total volume of concrete you're required to mix and this means you also have to fish out the other elements that make up the entire concrete such as Granite, Cement, sand and water …

cement sand aggregate required one cubic meter for m20 ...

AND CEMENT CONTENT OF ORDINARY GRADE CONCRETE .... 1:1.67:3.33 by weight, which yields M20 grade concrete on 28 days curing. .... aggregate required per cubic meter of concrete would be 0.477 cubic meters and 0.954 cubic... More details » Get Price

RCC Calculator | Estimate Cement, Sand, RCC Online Calculator

Reinforced cement concrete or RCC calculator can be used to calculate M15, M20 and M25 mix ratio of cement, sand and jelly. At materialtree.com, you can also …

Calculation of materials for 1 m3 Concrete - YouTube

Oct 01, 2018· Quantities of materials for concrete such as cement, sand and aggregates for production of required quantity of concrete of given mix proportions such as 1:2:4 (M15), 1:1.5: 3 (M20), 1:1…

What is the quantity required for 1 cubic meter of M20 ...

For 1 Cubic meter * M20 = 1:1.5:3 * Total mix = 1+1.5+3 = 5.5 * Dry quantity of one cub.m. Of C. Concrete = 1.54 cub.m. * Quantity of cement = 1×1×1.54/5.5 = 0.28 cub.m. * * Number of bag = 0.28/0.034 = 8.23 bag * Quantity of sand = 1×1.5×1.54/5....

Calculate Cement Sand & Aggregate - M20, M15, M10, M5 ...

Weight of Cement required for 1 cubic meter of M20 Grade concrete. Weight of cement required can be calculated from multiplying the volume of cement with the bulk density of cement. The bulk density of frequently used cement varieties (both PPC and OPC) is 1440 kg/cu.m.

how much cement in 1 cubic meter - Yeesh

how much cement for 1 cubic meter of m20 grade concrete. design of concrete grade like M20, M25, how much cement in 1 cubic meter of concrete m25, What is the mix design for m20, m15, m25 and mm30 concrete More Details Quantities of Materials Per Cubic Meter of Concrete Mix.. m10 grade concrete mix design for 1 cubic meter. Get Price

What is the quantity of water in one cubic meter of concrete?

quantity of water per cubic meter is varied according to the required grade of concrete & as per the design mix. water/cement ratio is a major indication for the concrete grade ie If designed w/c =0.5, the quantity of cement by weight = kg/m3, then it means that we need L of water/m3 for this grade of concrete.

Concrete Mix Design – M 20 Grade Of Concrete

i need to find how to calculate the cement and sand and jelly quantity for 1 cubic meter for m20 Concrete please reply as soon Reply Link ajit kumar December 7, 2011 at 1:12 am

how much cement in 1 cubic meterin m25

How many cement bags are used in 1 cubic meter in M20?Jun 14, 2018How much water is used in one cubic meter of concrete, M25Mar 30, 2017How much of the M25 concrete mix do I need for 1 cubic How many bags of cement are used in M25 grade? See more results; how much cement in 1 cubic meter …

How to calculate quantity of cement,sand & aggregate in ...

Quantity of aggregate in cubic feet = 3 x 1.54 /5.5 x 35.3147 = 29.66 cu.ft. Water: For M20, 30 liters of water per 50kg cement . Total amount of water required = 30 x 403.2 / 50 = 241.92 litre. 8.064 bags of cement required for 1 cu.m of M20 grade concrete. 630 kg of Sand required for 1 cu.m of M20 grade concrete.

Grade of Concrete | Concrete Grade Ratio | M10,M15,M20,M25 ...

Sep 01, 2017· How to Calculate Cement Sand and Aggregate for M-15,M20,M25 Concrete | M20 Grade | Grade of Concrete - Duration: 9:44. Civil Engineer- Fieldwork Expert 43,126 views 9:44

how to calculate 1:1.5:3 ratio concrete cement, sand, metal

how to calculate 1:1.5:3 ratio concrete cement, sand, metal and water please give me brief calcula.. Answer / devender singh For M20 Grade concrete the nominal mix is 1:1.5:3.

quantity of cement required in 1 cubic metre of m15 cement ...

The number of cement bags needed to build five cubic metre. as unit weight of cement varies from 830kg/cu.m-1650kg/cu.m volume of cement of ... What is the number of bags of cement required for 1 cubic meter of M25 .... cement bag consumed = 4.4 bags/cum M15(1:2:4) Grade of concrete …

how many liters of water required for 1cu.m concrete?

Answer / praneeth. Max cement use dfor 1 m3 of concrete is 450 kgs. if we consider normal w/c ratio as 0.4 Max water required becomes 450*0.4=180 litres of water

1 cubic meter concrete mixer

How to estimate sand required for 1 cubic meter of concrete - Quora ... NOMINAL MIX CONCRETE DESIGN FOR ONE METRE CUBE OF M20 CONCRETE ... 8 bags of cement to prepare one cubic meter of M20 grade concrete ... the moisture content provided we use dry aggregate while mixing. ... (1 in. by adding 10 lb of water per cubic yard of concrete). Details ...

How To Calculate Cement, Sand, & Aggregate Quantity In 1 ...

Aug 03, 2018· Consider volume of concrete = 1m3. Dry Volume of Concrete = 1 x 1.54 = 1.54 m3 (For Dry Volume Multiply By 1.54) Now we start calculation for find Cement, Sand and Aggregate quality in 1 cubic meter concrete. CALCULATION FOR CEMENT QUANTITY; Cement= (1/5.5) x 1.54 = 0.28 m 3 ∴ 1 is a part of cement, 5.5 is sum of ratio